Norvegia: E39 Fløyfjell tunnel, upgrading of emergency stations and CRM installations
Data licitatiei 08.04.2026
Expirat

26

26
| Valoare estimata : 0
|
Tip anunt:
UE
|
ID: 10657650
|
Data publicarii :
10.03.2026
|
Tara/Judet:
NO |
|
Descriere scurta:
Norvegia: E39 Fløyfjell tunnel, upgrading of emergency stations and CRM installations
Coduri CPV:
45000000-7 - Lucrări de construcţii
45200000-9 - Lucrări de construcţii complete sau parţiale şi lucrări publice
45220000-5 - Lucrări de inginerie şi de construcţii
45221000-2 - Lucrări de construcţii de poduri şi tuneluri, puţuri şi pasaje subterane
45221200-4 - Lucrări de construcţii de tuneluri, puţuri şi pasaje subterane
45221240-6 - Lucrări de construcţii de tuneluri
45221241-3 - Lucrări de construcţii de tuneluri rutiere
45300000-0 - Lucrări de instalaţii pentru clădiri
45310000-3 - Lucrări de instalaţii electrice
45315000-8 - Lucrări de instalare de echipamente de încălzire şi de alte echipamente electrice pentru clădiri
45315100-9 - Instalaţii electrotehnice
48000000-8 - Pachete software şi sisteme informatice
48900000-7 - Diverse pachete software şi sisteme informatice
48920000-3 - Pachete software de birotică
48921000-0 - Sisteme de automatizare
|
Textul licitației
to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upgrading project must be carried out without significantly touching the existing installations. The E39 Fløyfjell tunnel is located in Bergen municipality and is the main thoroughfare from the north and east to the centre of Bergen. The southern lane (towards the centre) was opened for traffic in 1989 and has a length of 3,195 metres. The northern lane (from the centre) was opened for traffic in 1988 and has a length of 3,825 metres. Annual daily traffic (ÅDT) for the tunnel was approx. 48,000 in 2024. Work to be carried out (not exhaustively): New automation installations, new emergency power supply and new emergency stations shall be established and commissioned before the old facility can be removed. The automation installations shal