Norvegia: Preparation of a planning programme, development plan and construction plan - new thirteen bridge in Øyer municipality - Stage 1
Data licitatiei 10.10.2025
au mai rămas 31 zile

5

5
Valoare estimata : 0
|
Tip anunt:
UE
|
ID: 9994144
|
Data publicarii :
08.09.2025
|
Tara/Judet:
NO |
Descriere scurta:
Norvegia: Preparation of a planning programme, development plan and construction plan - new thirteen bridge in Øyer municipality - Stage 1
Coduri CPV:
71000000-8 - Servicii de arhitectură, de construcţii, de inginerie şi de inspecţie
71200000-0 - Servicii de arhitectură şi servicii conexe
71240000-2 - Servicii de arhitectură, de inginerie şi de planificare
71250000-5 - Servicii de arhitectură, de inginerie şi de măsurare
71310000-4 - Servicii de consultanţă în domeniul ingineriei şi al construcţiilor
71313400-9 - Evaluare a impactului asupra mediului pentru construcţii
71313440-1 - Servicii de evaluare a impactului asupra mediului pentru construcţii
71320000-7 - Servicii de concepţie tehnică
71322000-1 - Servicii de proiectare tehnică pentru construcţia de lucrări publice
71322300-4 - Servicii de proiectare a podurilor
71324000-5 - Servicii de estimare
71327000-6 - Servicii de proiectare a structurilor portante
71332000-4 - Servicii de inginerie geotehnică
71351200-5 - Servicii de consultanţă în geologie şi în geofizică
71351920-2 - Servicii de oceanografie şi de hidrologie
71324000-5 - Servicii de estimare
71324000-5 - Servicii de estimare
|
Textul licitației
art of county road 254. The bridge was a truss bridge made of steel and wood. The main span was 70 metres and a total of 148 metres of bridge with two lanes and pavements was initiated. Temporary bridge, stand-by bridge loaned by the Norwegian Public Roads Administration, came into place in the summer of 2023. Temporary bridge has 10 years approval. A feasibility study was first prepared, of which four different placements were assessed. Here a new bridge was adopted near the existing bridge. The location had to be directly upstream or downstream, as the existing location was "seized" by a temporary bridge. The draft project provided further details on the feasibility study. The recommendation from Cowi was submitted in January 2024. The sketch project assessed 3 different routes in connection with the existing bridge, as well as 3 different bridge types. The recommendation was a steel a