Regatul Unit-Bristol: Lucrări de construcţii de instituţii de învăţământ şi centre de cercetare
-

1

1
| Valoare estimata : -
|
Tip anunt:
UE
|
ID: 779006
|
Data publicarii :
28.07.2014
|
Tara/Judet:
RE |
|
Descriere scurta:
Regatul Unit-Bristol: Lucrări de construcţii de instituţii de învăţământ şi centre de cercetare
Coduri CPV:
45214000-0 - Lucrări de construcţii de instituţii de învăţământ şi centre de cercetare
45453100-8 - Lucrări de renovare
|
Textul licitației
te the design and to construct the works forming the redevelopment of the Fry Building which is located within the main precinct at the University of Bristol.The project includes both new build and refurbishment works to the Grade II Listed building. The approximate key gross internal areas are 9,300 square metres of existing building and 1,000 square metres of new build. A more detailed description of the project is provided in the Project Brief.The University\'s preferred procurement route is a modified single stage NEC3Option 3 Fixed Price Develop and Construct although a final decision on the procurement route to be followed is yet to be taken.The overall project duration will be 70 weeks and the building is expected to be in use by the University for August 2016.The Design Team of Wilkinson Eyre and Buro Happold have already been appointed and it i