Irlanda: LCC - Produce a detailed Conservation Assessment and Method Statement (PSDP) for the section of Drogheda's Town Wall east of Featherbed Lane, between Laurence Street and Bachelor’s Lane
Data licitatiei 01.09.2025
Expirat

34

34
| Valoare estimata : 50,000 EUR
|
Tip anunt:
UE
|
ID: 9930220
|
Data publicarii :
14.08.2025
|
Tara/Judet:
IR |
|
Descriere scurta:
Irlanda: LCC - Produce a detailed Conservation Assessment and Method Statement (PSDP) for the section of Drogheda's Town Wall east of Featherbed Lane, between Laurence Street and Bachelor’s Lane
Coduri CPV:
71251000-2 - Servicii de arhitectură şi de măsurare
71351914-3 - Servicii de arheologie
71400000-2 - Servicii de urbanism şi de arhitectură peisagistică
71410000-5 - Servicii de urbanism
90712400-5 - Servicii de planificare a strategiei de gestionare sau de conservare a resurselor naturale
|
Textul licitației
: A detailed, site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out. Archaeological and ecological surveys will be carried out as part of the project, including mortar sampling and testing, under archaeological monitoring, but no building work in 2024. The studies would inform future applications, applications for Ministerial Consent and the drawing up of tender documents for works over the next few years. The surveys would also map, assess, characterise, describe and present the spaces on either side of the town wall, with particular emphasis on the changes in levels of the steeply-falling ground (there is approximately 10m of a height difference between the two streets). These studies would also inform future efforts to open up access to the town wall, on one or both sides, a