Norvegia: Prequalification: Ground work and construction of a transformer building as well as the establishment of cable trenches - Haugaland Næringspark
Data licitatiei 20.08.2026
au mai rămas 51 zile

5

5
| Valoare estimata : -
|
Tip anunt:
UE
|
ID: 11090935
|
Data publicarii :
01.07.2026
|
Tara/Judet:
NO |
|
Descriere scurta:
Norvegia: Prequalification: Ground work and construction of a transformer building as well as the establishment of cable trenches - Haugaland Næringspark
Coduri CPV:
31300000-9 - Sârmă şi cabluri izolate
31600000-2 - Echipament electric
45000000-7 - Lucrări de construcţii
45100000-8 - Lucrări de pregătire a şantierului
45200000-9 - Lucrări de construcţii complete sau parţiale şi lucrări publice
45210000-2 - Lucrări de construcţii de clădiri
45220000-5 - Lucrări de inginerie şi de construcţii
45223210-1 - Lucrări de structuri metalice
45223500-1 - Structuri din beton armat
45230000-8 - Lucrări de construcţii de conducte, de linii de comunicaţii şi electrice, de autostrăzi, de şosele, de aerodromuri şi de căi ferate; lucrări de nivelare
45232000-2 - Lucrări auxiliare pentru conducte şi cabluri
45232221-7 - Staţie electrică de transformare
45300000-0 - Lucrări de instalaţii pentru clădiri
45310000-3 - Lucrări de instalaţii electrice
45400000-1 - Lucrări de finisare a construcţiilor
71300000-1 - Servicii de inginerie
71310000-4 - Servicii de consultanţă în domeniul ingineriei şi al construcţiilor
71320000-7 - Servicii de concepţie tehnică
71500000-3 - Servicii privind construcţiile
|
Textul licitației
t in the area. In the long term the measure will also strengthen the security of supplies in Haugalandet and enable the connection of energy production from Tysvær wind power plant. The transformer station is planned to be erected with one station building and five transformer cells. This contract is for the ground work, as well as the construction of the station building and two of five transformer cells. The transformer station shall be certified in accordance with BREEAM-NOR v.6.0. The tenderer will be responsible for ensuring that the transformer station achieves BREEAM certification.In addition to the transformer station, the contract includes the establishment of a ground cable connection from the transformer station to the end mast (M22) on the aerial high voltage line connection between Klovning transformer station and Haugaland Næringspark, as well as cable trenches between St